EXT-File
(Redirected from EXT-Datei)
Jump to navigation
Jump to search
BlueM.Sim | Download | Application | Theory | Development
Input files · ALL SYS · FKT KTR · EXT JGG WGG TGG · TAL HYA TRS EIN URB VER RUE BEK EZG FKA · BOA BOD LNZ EFL · DIF
Time series
also refer to Theory: time series management
File
*Zeitreihen (*.EXT) *================== * *|-----|------|-----|----------------------------------------------------------------------------------| *|Datei| Einh |Intrp| Pfad zur Zeitreihendatei |Bezeichnung *| Nr. | | | | *|-<->-|-<-->-|-<->-|-<--------1---------2---------3---------4---------5---------6---------7--------->-| | A | B | C | D | E *|-----|------|-----|----------------------------------------------------------------------------------|
Kann es sein, dass Verdunstungszeitreihen nur mit Tagessummenwerten angegeben werden dürfen? Denn in der EZG_WEL wird dem Wert aus der Zeitreihe ein Tagesgang überprägt. MB
- Hint
- The *.EXT-File exported by TALSIM has a different format, than the format required by BlueM! Refer to TALSIM Export on how to convert it.
Explanations
- A: unique file number
- B: Unit (see below)
- C: Interpretation (see below)
- D: absolute or relative path to the time series file.
BIN- as well as ZRE-Files are accepted.ZRE-Files are converted to BIN-Files automatically before the simulation begins. Attention: During the conversion into the BIN-Format the units are changed (refer to ZRE_SYS in MODZRE). However an automatic reverse conversion is done in the code,if necessary.
m3/s, M3/S -> m3/s [Factor = 1.] l/s, L/S -> m3/s 1 [Factor = 1.] mm, MM -> m3/(s ha) [Factor = 10. / REAL(izschr)] muem, MUEM -> ?? [Factor = 1. / (REAL(izschr) * 100.)] mm/h, MM/H -> m3/(s ha) [Factor = 10. / 3600.] mm/d, MM/D -> m3/(s ha) [Factor = 10. / 86400.] m/s, M/S -> ?? [Factor = 10000.] °C -> °C [Factor = 1.]
- E: Description
Unit
The following units are recognized by BlueM:
- m3/s
- l/s
- mm
- muem (adjustment factor
zranp = 1. / (REAL(izschr) * 100.)
, possibly means Thsd.m³, refer to MODZRE, as of line 6172 (Rev 71)) - mm/h
- mm/d
- m/s
- °C
Interpretation
The following interpretations are possible:
- 1: Instantaneous (e.g. discharge)
- 2: Block right, measured value left (standard value)
- 3: Block left, measured value right
- 4: Cumulative
- 5: Cumulative per time step (e.g. precipitation)
Attention:
Block right and Block left only work correctly for an intensity (e.g. [mm/h])!
Cumulative per time step only works correctly for heights (e.g. [mm])!