TXT-File
Jump to navigation
Jump to search
For information on the inflow a regular SWMM5 data file is required. BlueM.MPC requires the complete inflow information for all nodes before simulation of the MPC process starts. This file is edited according to the forecast definitions in the XML-File during the MPC simulations.
SWMM5 Interface File SWMM 5.0.018 60 - reporting time step in sec 2 - number of constituents as listed below: FLOW LPS COD MG/L 2 - number of nodes as listed below: S101 S201 Node Year Mon Day Hr Min Sec FLOW COD S101 2008 04 01 12 00 00 0.000000 0.000000 S201 2008 04 01 12 00 00 0.000000 0.000000 S101 2008 04 01 12 01 00 33.000000 600.000000 S201 2008 04 01 12 01 00 33.000000 1200.000000 S101 2008 04 01 12 02 00 33.000000 600.000000 S201 2008 04 01 12 02 00 33.000000 1200.000000 . . . S101 2008 04 01 12 40 00 45.579512 708.161132 S201 2008 04 01 12 40 00 125.050665 518.658554 S101 2008 04 01 12 41 00 47.228195 717.314385 S201 2008 04 01 12 41 00 134.332867 521.494628 S101 2008 04 01 12 42 00 48.933678 725.880813 S201 2008 04 01 12 42 00 143.685702 526.921716 S101 2008 04 01 12 43 00 50.690311 733.818294 S201 2008 04 01 12 43 00 153.072282 534.278128 S101 2008 04 01 12 44 00 52.492722 741.097563 S201 2008 04 01 12 44 00 162.458869 542.981001 S101 2008 04 01 12 45 00 54.335798 747.699897 S201 2008 04 01 12 45 00 171.814748 552.515108 . . .
Note: Development of BlueM.MPC has been discontinued!